Our Process
Step 1
Remove Old Mastic
Step 2
Joint Prep
Includes complete cleaning, as well as the grinding of walls to ensure
proper adhesion
Step 3
Installation of New Backer Rod
as Necessary
Step 4
Mastic Installation
Step 5
Broadcast Grit
Step 1
Remove Old Mastic
Step 2
Joint Prep
Includes complete cleaning, as well as the grinding of walls to ensure proper adhesion
Step 3
Installation of New Backer Rod
as Necessary
Step 4
Mastic Installation
Step 5
Broadcast Grit
Our process includes:
- Inspecting the existing pool mastic and removing it
- Then, we begin grinding the joint wall to ensure long term adherence
- We then apply the primer
- We will install a foam backer rod or sand on an as-needed basis
- Our process finishes with the application of mastic sealant and sand finish
- Our sand finish is available in either tan or gray
Ensuring regular inspections of your pool caulking is extremely important, we recommend having your caulking inspected and potentially replaced every 2-4 years.